Tuesday, April 26, 2011
Entry 6- 24/4/11
Today I did the testing, after asking a few people if they would test my work for me, I asked them on the phone because we are away on holiday. Each of them agreed so today I wrote they're names down for the different things. today i didn't do much and it only took me approximately ten minutes to do the testings.
Entry 5- 23/4/11
Today, I finished my design brief and started my design specification. In my plan for 20/4/11, it was written that I would do research, and for today it was written that I would do my design specification, that is the reason why I did my design specification first and then the next time I will do my research. It took a little time to do the design specification, but I still did it in those two columns, specifications and testings. I have never done a design specification for a video, so there were a few new things, that is why it took a little longer. I hadn't asked people to test my work, so that bit of work was still left, I couldn't just write the names without asking and so I didn't do the testings column. This session was fun, but I know that it will be a lot more fun when we actually act for the video.
Entry 4- 20/4/11
Today we had to do our Criterion A investigation. In my plan it was written that I should do the problem identification and design brief on Monday the 18/4/11, but instead I did it today because on Monday I had no time. My problem identification was quite long and i used my time effectively. My group and I decided that we should all use the same problems. So then we discussed the problems like bullying, etc. then I typed my problem identification. I had five minutes to do my design brief, but it was too little. I had to answer the three questions: what I'm making, who I'm making it for and how i will make it. I only managed to answer the first question, there was not enough time.
Tuesday, April 19, 2011
Entry 3- 15/4/11
This lesson was the time where we got to plan our Criterion B and D. The people in my group got a story board, but then we decided that we should each get our own because for the design we were supposed to have different storyboards. So in our plans we included some of the story, but not entirely the whole plot, it was just a summary. We finished our plans on time and handed it in through a folder called students.
Entry 2- 14/4/11
I was at home this time doing my plan, I did a plan for Criterion A and E. I didn't do B and D because we hadn't planned with the group and I needed to do so. I thought about the dates and the times that I would need to investigate and evaluate. Never before have we planned for them. We always only plan for create stage, but this time, it was the whole unit. This got a little long, but I still did it and overcame all my problems. This was boring and long but it was still very important to do.
Friday, April 15, 2011
Entry 1- 13/4/11
My group members are Rufayda, Christine and Cynthia. Today we were dicussing who in our group will play a certain role. Christine will be the director. Then Cynthia will bring the camera and me and Rufayda will be the producers. Then we will all play a role in the video, i will be the Arab girl and the rest will be the popular plastics and they will tease me. but we will have to get more actors, we'll organize that later. that was all for today